A federal plan to spend nearly $15 million on three wind projects at remote military radar sites on the Alaska coast is hitting the fan.

The Inspector General of the Department of Defense has issued a report saying the projects have been poorly planned. One should be canceled and the other two need more work as they are facing $1 million cost overruns, the independent agency recommends.

There have been "multiple turnovers in project managers and a file server migration that resulted in the loss of several project files," the report concludes.

The wind power plan was to provide energy for Air Force radar sites at Cape Lisburne, Cape Newenham and Cape Romanzof.

One problem is that the prototype project has been anything but smooth sailing, according to the federal report. Nearly nine years ago the 611th Civil Engineer Squadron at Elemendorf selected Tin City, a radar station on the Seward Peninsula, as a test site to see how wind power might be used to cut energy costs.

The Air Force signed a contract in 2007 and construction was completed in 2008 at the facility, on a remote and windy site about 600 miles west of Fairbanks.

But the $2 million prototype doesn't work because the project managers didn't know enough about the local wind conditions, the report says.

"Completing a wind study would have provided 611th CES personnel the information necessary to determine the most advantageous location at which to build the turbine. Because 611th CES personnel did not complete a wind study at Tin City before construction, the turbine is located in an area with turbulent winds, and therefore, according to 611th CES personnel, produces sporadic, unusable power," the investigators said.

Two years ago the contract was expanded by $485,000 to correct the problems at Tin City by the end of 2010. But the winds are erratic and tests haven't been finished.

"As of July 29, 2011, the wind turbine was still not operational and continued to incur costs. DoD cannot quantify actual cost savings generated from the wind turbine until the contractor completes all modifications to power production and 611th CES personnel measure overall operational performance."

In a 2008 press release, which I have included below, the Air Force said extensive wind tests had been undertaken. The turbine is 110 feet high and the blades are 44 feet long.

The Air Force has proposed canceling the contract to build a turbine at Cape Newenham, a decision backed by Inspector General, the federal office assigned to conduct independent investigations of government projects.

But the auditors say more study is needed at the other two other sites. There are expecting cost overruns of more than $1 million on each project, pushing the total to $5.7 million apiece.

The "documentation provided by the Air Force does not fully support completing the wind turbine projects at Cape Lisburne and Cape Romanzof," the report says.

Here is the conclusion of the report:

Personnel at the 611

CES did not ensure that the three wind turbine projects were properly planned and supported. As a result, DoD cannot ensure that the three wind turbine projects are viable, that DUSD (I&E) personnel appropriately selected the projects for Recovery Act funding, and that Recovery Act funds were appropriately used.

We fully support renewable energy projects; however, executing the Recovery Act projects at Cape Lisburne, Cape Newenham, and Cape Romanzof LRRSs may not be compliant with Federal, DoD, and Recovery Act guidance. Without documented support for the potential investment costs, and energy and non-energy savings on the LCC analyses, DoD cannot ensure whether the calculations were correct, whether the discounted payback periods and SIRs met the minimum DoD criteria, and that DUSD (I&E) personnel appropriately selected the projects for Recovery Act funding.

Although it may be appropriate to use Recovery Act funds for conducting wind studies to determine the viability of future wind turbine projects at Alaska LRRSs, the projects were not shovel-ready and may be cost-ineffective. 611th CES personnel should revalidate the SIRs and payback periods of the projects. DUSD (I&E) should consider the results of the revalidations, results of the wind studies, and potential costs of alternatives considered such as termination costs, to determine the best course of action for the construction portion of the wind turbine contract.

In October 2008, the Air Force issued this press release on the Tin City project:

In an effort to reduce high operating costs at the Tin City Long Range Radar Station, engineers with the 611th Civil Engineer Squadron here have completed the construction of a wind turbine generator there. It is the first such generator to be installed on an Alaskan Air Force installation and within Pacific Air Forces.

The construction at the remote site, located on the Alaska coast near the town of Tin City, was funded by an award of $1.9 million through the Energy Conservation Investment Program, a Department of Defense military construction initiative.

The ECIP is specifically designed for projects that save energy or reduce defense energy costs. The wind turbine generator will augment the diesel-fueled power production system at Tin City, making it a wind-diesel hybrid.

"I'm very excited about the Tin City wind turbine energy project," said Col. Brent Johnson, 611th Air Support Group commander. This important milestone for the 611th Air Support Group will be the first renewable Air Force energy project in Alaska and is very timely, given the cost of fuel. Wind energy at Tin City should decrease our annual fuel consumption by 30 to 35 percent, about 85,000 gallons.

The radar site currently is powered by diesel generators. It is located at Cape Prince of Wales on the westernmost point of the North American mainland, on the western tip of the Seward Peninsula in the Bering Sea, approximately 700 miles northwest of Anchorage and approximately 600 miles west of Fairbanks.

The prevailing winds on the western coast of Alaska put the area in a class seven wind power density zone, the highest possible category. Wind power density is a useful way to evaluate the wind resource available at a site. The WPD indicates how much energy is available at the site for conversion by a wind turbine.

After extensive wind strength and reliability testing, it was determined that Tin City would be the ideal place for a single tower to test the real-world application of wind generation at remote radar stations. During the testing, sustained wind of 83 miles per hour, which is equivalent to a Category 1 hurricane, were experienced. However, according to 611th CES engineers, the average wind speed at Tin City is about 19 miles per hour.

"That's separate from the maximum sustained wind speed experienced, which was 83 miles per hour," said Tony Alecci, 611th CES energy management chief. "Not saying it's 83 miles per hour often, but it illustrates the extreme conditions at the site."

A potential annual energy savings of $433,000 is estimated. The current digital control system, to accompany the tower, allows for more control of the existing diesel generators. This allows the site operators to completely shut down the diesel generators when the wind strength is sufficient to power the site. It allows for tailoring the diesel power production to complement the wind production, thus minimizing the fuel usage at the site. The resulting reduction in diesel generator run time is estimated to save $10,000 in reduced maintenance costs annually.

In order to harness the available wind, there were a number of challenges. The first was the amount of icing that coastal sites experience, with Tin City being the worst.

The construction and installation contractor, Tanadgusix Corporation has extensive experience with cold weather wind generation from their St. Paul Island, Alaska, wind turbines. Together with the engineers from the 611th CES, a cutting-edge cold weather package was developed to meet the unique needs of such a harsh environment.

The foundation of the package is an electric based heat system that blows warm air up the tower base and through the tips of the turbine blades to shed the expected icing load.

In addition to icing issues, airfield safety, radar interference and migratory bird strike issues needed to be addressed. Through working with the FAA and the use of Avian studies, potential tower locations were identified that would provide for negligible impacts on any of the three challenges.

"The 611th Air Support Group is working smarter," said Lt. Col. Charles Busch, former 611th Civil Engineer Squadron commander. "With the installation of the wind turbine at Tin City, we are using proven, commercial, off-the-shelf technology. Similar turbine units are in use at Nikolski, Sand Point and St. Paul Island, Alaska. Wind turbines are not new to the U.S. Air Force, but they are new to Pacific Air Forces and 11th Air Force in Alaska."

With the reduction in fuel consumption, Colonel Busch said the return on investment should be realized within about four and a half years.

"We have several other wind turbine projects scheduled," said Colonel Busch. "The 611th CES is currently pursuing wind turbines at Cape Lisburne, Cape Romonzof and Cape Newenham. Engineering work is also taking place to judge the suitability of wind power generation at Eareckson Air Station."

By presidential order, federal agencies must improve energy efficiency and reduce greenhouse gas emissions by three percent annually through the end of fiscal 2015, and, to the extent feasible, implement renewable energy generation projects on agency property for agency use.

"The 611th continues to work aggressively toward meeting the presidential energy goals," said Colonel Busch.



Date Title
10/28/11 10th El Paso policeman accused of overtime fraud
10/28/11 Rolling billboard promotes Louisiana produce
10/28/11 11 charged in L.I.R.R. disability fraud plot
10/28/11 More Americans receive government benefits
10/28/11 Why does a thriving business need a $1-million handout?
10/28/11 L.A. seeks federal TIGER funds for 50-mile River Bikeway
10/28/11 Villaraigosa, Boxer press for federal funds for 6th St. Bridge
10/27/11 Critics attack brownfield idea
10/27/11 Federal stimulus dollars at work in Havelock with new city hall
10/27/11 Stimulus money pays for street, traffic lights made largely overseas
10/27/11 Court documents say state employee conspired to illegally obtain federal stimulus money
10/27/11 Renewable-energy firms facing financial hurdles
10/27/11 FBI searches Charleston developer's office
10/27/11 Investigator: $3.2 billion in overpaid tax credits
10/27/11 USDA awards grant to Garden State programs
10/27/11 $1 million in grants to foster Pennsylvania specialty crops
10/27/11 Northwest trade mission to push potatoes in Asia
10/27/11 U.S. Gov't financial regulators earn tax-funded salaries of $225,000-plus
10/27/11 Farmers get enviro grants
10/26/11 Librarians hope to keep loan vans rolling
10/26/11 Future of solar and wind power may hinge on federal aid
10/26/11 Clean-energy developers reaped excess U.S. aid, auditors say
10/26/11 18 months for using housing grants on himself
10/26/11 $5.02 million federal contract awarded to American Small Business Alliance
10/26/11 City used business loan fund to help pay for skating rink
10/26/11 Providence loan fallout: Delinquent organization received cash from state too
10/26/11 Providence stiffed for millions in loan money
10/26/11 MSU receives almost $743,000 for research, new courses involving sheep and organic farming
10/26/11 State Department buys $70,000 worth of Obama books
10/26/11 America’s Car Museum takes shape in Tacoma
10/26/11 Long-term survey reveals gen Xers are active, balanced and happy
10/25/11 Debts of U.S. states over $4 trillion - budget group
10/25/11 Layoffs may hit Toon Town: Senators go after DHS mascots
10/25/11 Man pleads guilty to falsely claiming citizenship, getting $120,000 in benefits
10/25/11 Why the USDA rejected NYC's food stamp soda ban
10/25/11 Basket case: Is lobster the issue?
10/25/11 Action urged to get Tennessee state workers off food stamps
10/25/11 Under new federal program, all Muskegon Heights students get free meals
10/25/11 Whatever Oregon's trying to communicate, it's costing you millions
10/25/11 Federal transportation funding mandates — the coming Capitol Hill battle
10/25/11 Senators outraged U.S. borrowing big from China while also giving it aid
10/24/11 USAID and Green Mountain Coffee Roasters join forces to help small-scale coffee growers
10/24/11 UGA gets $1.2M grant to study nutrition in pecans
10/24/11 Army's housing budget busters include mansion renovation
10/24/11 2-year-old courthouse to get renovation
10/24/11 NJ needs to tighten monitoring on spending homeland security funds, audit says
10/24/11 Federal security funds granted to hundreds of N.Y. nonprofits from 2006 to 2009 total in millions
10/24/11 Food stamps fraudsters using Web as tool
10/24/11 Some states adding assets to food stamp qualification
10/24/11 Federal stimulus money for Oregon jobs hired foreign workers
10/24/11 Federal grant money to benefit raspberry growers
10/20/11 GAO avoids layoffs but may furlough employees
10/20/11 Justice Department announces more than $130 million in cost saving and efficiency measures to utilize resources more effectively
10/20/11 Former ICE employee admits stealing from the government
10/20/11 CSI: The Experience
10/20/11 Robotic dragon, an unlikely teacher
10/20/11 University gives back $37,000 in grant money
10/20/11 'Gross financial mismanagement' cited in local Head Start program closures
10/20/11 Baldwin Park superintendent says district will buy better food to serve students
10/20/11 Missed connections
10/20/11 Homeland security getting creative with Metro vigilance ads
10/20/11 RNC convention planners get $18M federal grant
10/20/11 Man living as an ‘adult baby’ is cleared of Social Security fraud
10/12/11 New Orleans farmers' market group to share in federal grant
10/12/11 Federal grant to promote Michigan's live Christmas trees, poinsettias, among $1.3 million awarded to state agricultural projects
10/12/11 Workers' comp costs Postal Service more than it should, IG finds
10/12/11 Attleboro resident forced to open restaurant or pay up
10/12/11 VA's 11-day, $221K resort stay draws scrutiny
10/12/11 IRS inability to rein in tax fraud vexes law enforcement
10/11/11 Air Force base in Greenland sells $1M in scrap metal
10/11/11 Agencies accelerate data center closures
10/11/11 Federal agencies turn to contractors for social media help
10/11/11 Job training boards spend only 20% of funds on job training, LePage says
10/11/11 N.J. charter school awarded grant has not been given permission to open
10/11/11 Fight for job leaves Stephen Patrick idle and on the federal payroll
10/11/11 Job duties increasingly not linked to grade, pay
10/7/11 3 entrances at agency's HQ to be shuttered due to budget cuts
10/7/11 Budget cuts prompt GSA to halt renovation of its headquarters
10/7/11 Transportation museum’s opening delayed
10/7/11 Four arrested in government bribery and contracting scam
10/7/11 Current record
10/7/11 State: Baldwin Park schools misspent nearly
10/7/11 Board to evaluate Saginaw Housing Commission director's performance behind closed doors
10/4/11 Mayor Tautznik responds to critical signs in Easthampton
10/4/11 Report: Federal green-jobs program fails to produce
10/4/11 National Renewable Energy Lab in Golden to cut 100-150 jobs through buyouts
10/4/11 E. Tenn. truck stop got stimulus money despite bankruptcy
10/4/11 NTU’s Jim Brown receives $550,000 NEH grant for his film “Rockin’ the Kremlin”
10/4/11 Stimulus makes class fun
10/4/11 State agencies are big casino customers
10/4/11 Dining on your dime: Government eats well